arrow_drop_up arrow_drop_down
chevron_right print

Vista previa e impresión

Propiedades

Resumen del procedimento

Institutions involved 2 expand_more expand_less

Kenya Commercial Bank
Kenya Commercial Bank
Kisumu City Hall (x 4)
Kisumu City Hall

Results 3 expand_more expand_less

Authenticated Architectural plans
Authenticated Architectural plans
Authenticated structural plans
Authenticated structural plans
Construction permit
Construction permit

Required Documents expand_more expand_less

Architectural drawing (x 2)
Architectural drawing
Survey plan
Survey plan
Proof of land ownership
Proof of land ownership
Structural drawings (x 2)
Structural drawings
Structura idemnity form
 Structura idemnity form
Architectural design report
Architectural design report
Structural design calculations
Structural design calculations
Engineer's practicing certificate
Engineer's practicing certificate
Architect's practising certificate
Architect's practising certificate
Change of use
Change of use
Construction permit invoice (x 2)
Construction permit invoice
Bank deposit slip
Bank deposit slip
Billed receipt
Billed receipt
Notification of approval
Notification of approval

Detalle de costos

Calcule sus costos

Kenyan Shilling 3,400
Minimum charges for architectural fees for a commercial building measuring below 46metres -estimate
Kenyan Shilling 3,000
Minimum charges for structural fees for a public facility measuring below 46metres-estimate
Kenyan Shilling 2,000
For construction board fee
Kenyan Shilling 1,000
For inspection of building files and sheet
Kenyan Shilling 3,500
For occupation certificate for a commercial & industrial building measuring below 48metres - estimate
Kenyan Shilling 7,000
For Public Health Inspection fee for commercial multistorey building-estimate
Kenyan Shilling 0 -
Kenyan Shilling  1,000 por Beacon
For beacon identifiction or verification
Kenyan Shilling 2,500
For Environmental Impact Assessment site verification fee
Kenyan Shilling 0 -
Kenyan Shilling  5,000 por floor
For building inspection
  Min. Max.
Duración total: 9 días 29 días
de la cual:
Espera en fila: 15mn 50mn
Atención en ventanilla: 45mn 3h. 50mn
Entre pasos: 9 días 28 días
Architects and Quantity Surveyors Act Architects and Quantity Surveyors Act
  Sections 7, 8, 9
Building Code Building Code
  Sections 3, 4, 5, 7, 8, 9, 10, 11
Kisumu county Finance Bill 2014 Kisumu county Finance Bill 2015
Physical planning Act Physical planning Act
  Sections 4th schedule, 30, 31, 32
Survey act Survey Act
  Sections 30, 32, 33
Powered by eRegulations ©, a content management system developed by UNCTAD's Business Facilitation Program and licensed under Creative Commons License