Obtain Petroleum construction permit  (2) expand_more expand_less

arrow_drop_up arrow_drop_down
chevron_right print

Vista previa e impresión

Propiedades

Resumen del procedimento

Institutions involved 1 expand_more expand_less

Energy Regulatory Commission (x 2)
Energy Regulatory Commission

Results 1 expand_more expand_less

petroleum construction permit

Required Documents expand_more expand_less

-
Gratuito
  Min. Max.
Duración total: 15 días 31 días
de la cual:
Atención en ventanilla: 35mn 1h.
Entre pasos: 15 días 30 días
Energy Act Energy Act