Steps (17) arrow_drop_up arrow_drop_down
Obtain approved architectural plans  (6) expand_more expand_less
Obtain Public health approval  (6) expand_more expand_less
Obtain structural plans approval  (5) expand_more expand_less

arrow_drop_up arrow_drop_down
Summary of the procedure

Institutions/Systems involved 5 expand_more expand_less

Kwale County Physical planning Department (x 4)
Kenya Commercial Bank (x 3)
Kwale County Treasury (x 3)
Matuga Subcounty Public health Office (x 2)
Kwale County Structural Engineer Department (x 3)

Results 4 expand_more expand_less

Authenticated architectural plans
Notification of development approval (PPA2)-Kwale
Authenticated structural plans
Notification of approval (PPA 2)

Required Documents expand_more expand_less

Application for development permission form -Kwale (x 2)
Rates clearance certificate - Kwale (x 2)
Architectural drawings (x 3)
Official land search (x 4)
Proof of land ownership (x 4)
Architect's practising certificate (x 4)
Engineer's practicing certificate (x 4)
Payment slip (Kwale) (x 3)
Bank deposit slip (x 3)
Application for development permission (PPA 1 form) (x 2)
Official receipt Kwale (x 3)
Authenticated architectural plans (x 3)
Physical planning comment sheet (x 2)
Structural drawings (x 3)
Stamped architectural plans (x 2)
Structural design calculations (x 2)

Estimated cost KES  16,000

expand_more expand_less

KES expand_more expand_less
  • KES Add Name Here
This is an estimate based on a series of assumptions which you can modify to calculate your own costs:

Cost detail

Estimate your cost

KES 2,000
For application processing
KES 3,000
Assessment fees
KES 2,000
For application processing
KES 3,000
Assessment fees
KES 0 -
KES  35 per square metre
Building permit fees
KES 0 -
KES  15 per Build up area (m² )
Structural fees
KES 3,000
Occupation certificate fees
KES 3,000
Septic tank and soak pit fees

Total Duration 5d  - 14d  expand_more expand_less

  Min. Max.
Total time (sum): 5d 14d
of which:
Waiting time in queue (sum): 1h. 5mn 4h. 25mn
Attention at counter: 1h. 20mn 4h. 5mn
Waiting time until next step (sum): 4d 1/2 12d

Laws 3 expand_more expand_less

Kwale Finance Act
Physical planning Act 2019 Physical planning and Land use Act No. 13 of 2019
Public Health Act Public Health Act